This morning when I was reading the delay line software manual I realized that the software itself can set triggering to the delay line stage. One thought was to set "perfect" delay time both on CCD and on delay line software to make them work automatically. Considering this "perfect" would never be possible due to the uncertainty of CCD exposure time and delay time, I still needed to find a way to sync all the things together. Fortunately, I found another way to solve the problem. I downloaded Thorlabs' APT controller, which supported Labview, C++,  and Matlab editing. I wrote the Matlab code to control the APT, which was connected to the delay line. APT works like a server, while Matlab scripts work as a client.

I tested my stage moving and the "jog" worked pretty well: